Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Item #

Severity Level

Escalated Y/N

Description/Risk

Owner

Mitigation Strategy

Next Step

Priority

JIRAs

Date

1.

Severe: Affects Financial Aid Integration

N

Financial Aid Pilot:

  • Issues with Workflow

  • Peoplesoft college dropped out of pilot

  • Colleague and Banner pilot colleges both have stopped responding

Parchment

  • Workflow issue was resolved by Parchment, but CVC needs to test.

  • We can’t test to prove it’s working until we have a pilot college test with us and they have stopped responding.

  • In process with Allan Hancock and Copper Mountain P2 Teaching College Implementations

Status
colourRed
titlehigh

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLQ-1015

3/1522/24

2.

Moderate: Users Were Not Able to Authenticate to CVC via Proxy

Yes

On Friday, Dec 15th, all student attempts to authenticate to our platform via the proxy seem to be failing. No one was been able to sign in. We've seen 100% failure rate on all attempts from every user who has tried at every college since about 6 AM Friday morning.

CVC reached out to CCCTC support team but they didn’t seem to have any insight into what could be causing this as they have shared that no one else has reported any issues.

However, we kept receiving a 403 Forbidden error message when we try to connect to any college via the Proxy. This is impacting both production and pilot and began failing around the same time on Friday. Whenever a user selects any college where we would normally route them to the appropriate SSO page, we instead are getting this error.

https://search.cvc.edu/users/sign_in (select any college)

  • CVC and CCCTC

  • We escalated this to Mike Caruso at the CCCTC and he advised they were able to log in with no issues.

  • After further research, it looks like the CCCTC had some additional IP restrictions and our IP was possibly whitelisted.

  • This issue was resolved same day, but we are working with the CCCTC and Parchment to ensure this does not happen in the future.

  • CVC and Jason from Parchment are working to investigate to ensure this doesn't happen again in the future.

    Jason has provided the following update about next steps and continuing research with the CCCTC: “I've gotten some additional information on this, the net of which is that this part of our application isn't capable of being configured on a guaranteed static IP. There's work we can do to make it semi-static, meaning it still may change with some, but even so change of the outbound IP can happen for reasons outside our control. 

    A "more static IP" change is not something we can implement immediately, given the holidays and that such a change may impact other users.

    I can't speak to if this was also a risk in the Heroku infrastructure days or not, but I'm slightly concerned as in our current state, as this could happen again based on factors we can't really control.

    So, I have these questions for the Tech Center:

    • Is this a new practice? If so, can it be rescinded until we have time to ensure there's a lesser risk configuration on our side?

    • Can the Tech Center whitelist by fqdn, rather than by IP? On our end, this is the best solution because we can implement what we have in the rest of the platform, which ensures traffic will always be sourced from 

    egress.parchment.com even though the IP addresses assigned to that may change in a way we can't control.

    As an aside, we don't have great logging of this on our side, so normally we'd put a monitor in place that fires the moment we start seeing it. We're not in a position to do that yet.”

  • CVC to reach out to the CCCTC and check on the status.

Status
colourRed
titlehigh

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLQ-1041

3/1522/24

3.

Severe: Will Affect All eTranscripts Sending Colleges Who Are on SaaS

Y

Manage The CCCTC/Ellucian SaaS Shared Application Staging Tables In Conjunction With The GLUE Data Model - SaaS Migration Process

Mike V.

For colleges who are either a SaaS client or migrating over to SaaS, the current Ellucian APIS will not support eTranscript CA sending infrastructure. This affects colleges that are already live with eTranscript sending through Parchment/XAP as well as the ones who are migrating.

  • Parchment submitted requirements to Ellucian.

  • Ellucian received andi s and is actively looking into this and advise if this is configurable or if they need to do development.

Status
colourRed
titlehigh

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLC-138

3/1522/24

Moderate: Could Affect Quarter Colleges

Y

CVC was made aware that DeAnza College students were able to cross enroll before their open registration date official started.

Parchment

CVC caught the situation and was able to get those student courses canceled, as well as reach out to the students to inform them they need to find a different course to cross enroll into.

Parchment will take a look at the logs to see who enabled their dates in the session management part of the admin panel.

  • CVC has escalated the 2 JIRAs that can fix this issue. Parchment to review internally and get back to us.

  • In the meantime, CVC will manually monitor this until solution is in place.

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLQ-1026

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLQ-967

3/1522/24

...

Weekly Project/Product Summary

Item #

Topic

Item Details: Weekly Activity/Decisions

Next Steps

Priority

Important Links & Documentation

Last Update Date

1.

Weekly Combined Requirements Meeting Notes & Recordings

  • We meet every Tuesday to discuss items that need attention, analysis, escalated, or enhanced. All recordings, notes, and next steps can be found on the running combined requirements meeting agenda.

  • Next meeting is 3.26.24

Status
colourRed
titlehigh

https://docs.google.com/document/d/1S3zLxqu6CLDmIO6Eq1YmOlo-gPG_Hwn6-lyaEiTpkQE/edit

3/1524/24

2.

Weekly Error Report

  • Parchment is building this into the Student Enrollment Report so that in the near future we can run this report on demand. CVC working with Parchment on location of report

  • Error report is now on the Student Enrollment Details Report at the person level. We will remove this line from upcoming reports.

N/A

Will attached this next week once we have access to the report.

3/1524/24

CVC Support Cases Report

Parchment has started to send support case reporting with granular level breakdown.

N/A

N/A

This report will be provided on a monthly basis.

3/1524/24

4.

CVC Enrollment Tracker

Parchment has started to send enrollment tracker reporting with granular level breakdown.

N/A

N/A

This report will be provided on a monthly basis.

3/1524/24

5.

Canvas Solution for ILP Colleges

  • Database access to ILP team today

  • Test environment is not updated for Kern, so will work to get this updated.

  • Development will be done by 12/19/23.

  • CVC is actively working to expand the ILP testing group to Lassen to complete testing of the logins workaround with a Colleague client. Meeting with Lassen IT on 2/23.

  • No new updates this week.

Status
colourRed
titlehigh

3/2122/24

6.

Parchment Weekly Sprint Jira Status Updates

Lane 1: Major Functional and Implementation Blockers

  • Financial Aid Integration Workflow BLQ-1015 - Moving forward with Copper Mountain College and Allan Hancock College as meetings are scheduled. Will update if there are any new blockers. 

  • System time zone for CVC Test and Prod sites PICE-537 - Parchment team to review and find solution in coming weeks.  

Lane 2: Renewal Enhancements

  • Financial Aid implementations  - Allan Hancock KO meeting was on 3/4/2024. Copper Mountain meeting scheduled for 4/1/24. Next steps to be determined as AHC is available.   

  • Document search result output sorting methods BLQ-979 & BLQ-1008 - Questions regarding whether this will be elastic search or something similar have been raised. CVC is hoping for a demo of the planned changes during the week of April 15th to prepare for a meeting on April 26, 2024. 

  • Student Eligibility Checker - Ongoing, in process. 

    • BLN-729 N2N To Create API Specs, Place on Conf, And Send To Parchment

    • BLN-745 Parchment To Develop Feature Flag To Enable College Rollout Enablement

    • BLN-746 Parchment To Develop Progress Bar

    • BLN-748 Parchment To Develop Ability To Consume eligibilityStatus = and eligibilityStatusReason =

    • BLN-749 Parchment Work for Term Rule Requirement

    • BLN-837 Parchment to Add/Display CVC Provided URL To Student Ineligible Page

Lane 3: Prioritized Enhancements and Research

  1. Add The Student's Teaching College SIS ID To Congratulations Page BLQ-1023Mock up was approved, will going into staging on Friday, 3/22 for CVC to review for promotion to production. 

  2. Payment Status, Errors, and Reconciliation BLQ-724  - CVC has provided updated language, Parchment work pending.

  3. Add Additional Text To The Drop Email Notification BLQ-1031 - In the work queue.  

  4. Determine Method to Identify Students Who Exist in the Teaching College Canvas Instance BLQ-572 - In progress.

  5. Parchment to Analyze and Provide Results for Expected APIs and Final States BLQ-1067 - Ongoing, goal to have completed by end of this week.  (This is also related to Complete application/integration diagram - BLQ-673 Diagram to be shared with CVC when available.)

  6. Session Management Changes BLQ-1026 and  UI Changes for Open Registration Dates and Inventory Imports BLQ-967 - No change. 

  7. Course Audit Needs to Still Run if the Student Dropped BLQ-1056 - We believe this is a UI issue and are investigating further. Will correct as needed. If it is found that this is more than a UI discrepancy, we will adjust our plan at that time.  

  8. Need Address Validation on the AER Form BLQ-1029 - Next steps to be determined. 

  9. Prevention Solution/Future Proofing For Issue That Occurred Where Users Were Not Able to Authenticate to CVC via Proxy BLQ-1041 - Mike believes we need to reconnect to finalize a permanent solution between Parchment and the Tech Center. Next steps TBD.  

  10. Change The Text and Adjust The Layout in the Home California College Section on cvc.edu BLQ-1038- This is still being discussed with the Parchment team. 

Parchment to Provide Technical Requirements for SaaS eTranscripts Compatibility BLQ-1061- this has been provided to Ellucian. Next steps are TBD.

Status
colourRed
titlehigh

3/1422/24

7.

eTranscript Implementations & Follow up with colleges

Below is the latest updates on where we are with each college:

  • Allan Hancock: 3.20.24: Met with the college and from a XAP and Parchment perspective, the infrastructure is in place and transcripts should be trickling in. Amanda requested a call to go over how the CVC unsolicited transcripts will work. Once they provide dates, I'll schedule a meeting.

  • Barstow 3.20.24: Sent email to Barstow and Parchment team asking for a status update. They are meeting with Parchment, Kevin Klempke on Monday 3.25. I asked that they provide us an update after the call.

  • Cabrillo CCD - 3.5.24: Emailed Parchment back advising that we are blocked on moving forward with Cabrillo until we have a SaaS solution in place. I will keep them informed with updates.

  • Compton CCD - 3.20.24: Reached out to Richette and asked to get the next call scheduled for receiving. She responded that she is including her Administrative Assistant, Tynay, on this email. She will assist with scheduling this meeting.

  • Copper Mountain CCD (ECA) - 3.21.24: Sean and I met with Copper Mountain today on eTranscripts and they are set up in beta and everything is working as expected. They want to wait to roll to prod in May for eTranscripts so they can go live as a P2 TC and XAP at the same time. I am going to go ahead and schedule a meeting in early May to get their XAP communicator installed in prod and then another call when they go live as a P2 to roll to prod with XAP.

  • College of the Desert CCD (ECA) 3.20.24: Sent email asking for a status update from college/parchment. Parchment responded that Samples were sent on 12/11/2023, we shared 28 files and if the XAP communicator is working currently they can then be uploaded and reviewed after processing. We are looking for the College of the Desert Registrar team to verify those 28 transcript files as accurate once the upload is completed with XAP and that processing is completed. If they are not approved, then we will be looking for feedback and can make any adjustments or schedule follow up. If they are approved, we are ready to schedule go live. Then we can get Florante some assistance on bulk upload formatting verification, as this is not part of what my team handles directly, but we'd be ready to move forward with our last steps if samples are approved." Will wait to see what the college responds with.

  • Feather River CCD (ECA) -3.20.24: Sent email again asking for a call to get kicked off. Contact Scott advised he is a CISOA and will respond when they get back.

  • Grossmont-Cuyamaca CCD (ECA) -3.21.24: Sent email to college asking for us to meet next week. Will follow on 4/4 if not response.

  • Marin CCD - 3.21.24: emailed Jon at the college and asked to set up a kickoff meeting to get this process started. No cohort established yet.

  • Merced CCD (ECA) 3.14.24: Met with Merced/Parchment/XAP and there are still issues with them getting sample files. Parchment will attempt to get those resent and when they do they want to give the school ime to review and then meet with them again. Todd when then schedule a meeting. Will flw up by April 4 if no response. Also - college brought up the lived name and preferred name new assembly bill. Amanda/Sean/Courtney to work on this as we have time to get this implemented.

  • Napa Valley CCD - 3.5.24: Napa Valley reached out and advised they are ready to meet for next steps. Amanda scheduled meeting for April 3rd.

  • Porterville - Kern CCD: 3.21.24: Emailed the A&R team to inquire about how they are sending transcripts. IT appears they have stopped sending.

  • Palo Verde CCD - 3.21.24: Sent email to Shelly at the college and requested a meeting for kickoff.

  • Peralta CCD (ECA) 3.21.24: Sent email to Dominique to advise we need to meet/get this project back on track since they are a live P2 teaching college. If no response, will have Mike escalate by 4/4.

  • Riverside CCD (ECA) 3.21.24: Met with Nicholas and Sean answered the questions but needs to consult with the IT staff on one question. Sean to get back to them. Emails still going back and forth with troubleshooting questions.

  • San Diego CCD (ECA) 3.21.24: Sent follow up email to see when everyone can meet. From there, Amanda to schedule.

  • San Francisco CCD 3.21.24: Sent email to the college to schedule a call to go ahead and start the process for setting up eTranscripts. As soon as they respond, I'll schedule a call.

  • San Joaquin Delta CCD (ECA) 3.21.24: Sent email to college and Parchment asking them to provide status/update/next steps

  • San Mateo County CCD - 3.21.24 - Sent email to demellon@smccd.edu to schedule meeting to do a kickoff call. No cohort established yet and they are not a home college.

  • Santa Monica CCD - 11.2.23 - Per Mike- hold off on reaching out.

  • Shasta-Tehama-Trinity Joint CCD (ECA) -3.18.24: Update from Parchment...Kevin Klemke, from Parchment let me know that he resent our test transcripts this morning. He noticed that our initial test files were still in the upload folder, and that the data was malformed. This has been corrected and new transcripts have been sent. The files from today will have overwritten the previously sent data. When you are able, please start the XAP communicator so that it can process these files. The hope is that they will process as expected and move into the success folder.

  • Sierra Joint CCD - 11.2.23- no cohort established, hold off on sending until then.

  • Siskiyou Joint CCD (ECA) 3.11.24: Received signed contract and sent to Sean. Emailed Sean and the college to ask if Sean sent test files yet/needs users set up for accts or password resets. Amanda to flw up on 3.14 if no response.

  • Solano CCD - 11.14.23 - Parchment sent email to Solano advising they need a status update. The college emailed us back stating: "Yes – our SaaS go-live date is April 8th, 2024. As noted by Amanda, I believe we have Parchment sending on pause until we have our integrations set up for SaaS. Our new timeline to become a “Teaching” College is to be part of the Fall 2024 Cohort. Once SaaS has been implemented with the given timeline, we can revist our setup for Parchment sending. I apologize if any of these plans have changed, as I am going off my previous meeting notes documented at the time. Parchment responded that they have canceled this project and will pick it back up when they are ready.

  • Victor Valley CCD (ECA) 9.16.23: Victor Valley is going to switch to SaaS in April 2024, so we will be placing this one on hold until after that migration.

  • West Hills - 3.18.24: Parchment/college are actively testing. Error with the log file on the Parchment side. Will continue to follow.

  • West Kern CCD (ECA) 2.19.24: Sent email to Kyle and asked how testing is going/see if they will be ready to go live this week or next.

  • West Valley-Mission CCD (ECA) 11.2.23 - Per Mike - hold off since they dont have a cohort established.

  • Yosemite CCD (ECA) -3.20.24: Live for sending eTranscripts via XAP!

  • Yuba CCD (ECA) 3.4.24: Met to set up XAP communicator. Next steps is for them to set up process internally. Amanda to check in 3 weeks from now to check on progress.

  • Amanda and Sean to continue reaching out to colleges next week to continue getting them set up on sending and receiving.

Status
colourRed
titlehigh

Status
colourPurple
titleIn Process

Tracking HC and TC transcripts here: https://docs.google.com/spreadsheets/d/1e3Nq1Kt3qACJLqN4nWfmP-mWjdgK8_fSLiQb_ufBjdE/edit#gid=48089342

/wiki/spaces/CVCOEI/pages/1749647361

/wiki/spaces/CVCOEI/pages/1731002371

Weekly Meeting Notes and Action Items will be here each week: https://drive.google.com/drive/folders/12_-PObf7ii0hgvV3g4S-EfWzUamAi8zd

Weekly Status Call Recordings Here: https://drive.google.com/drive/folders/1LF4RbCkYhAdKjPwhoEw2SdArlvo4-u9i

3/1522/24

Active Production Issues

server

JIRA, Description, and Status

Priority

Created Date

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyPICF-338

Status
colourYellow
titleMEDIUM

4/26/23

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyPICE-451

Status
colourYellow
titlemedium

7/26/23

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyPICE-471

Status
colourYellow
titlemedium

9/14/23

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyPICF-388

Status
colourYellow
titlemedium

10/17/23

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyPICE-494

Status
colourYellow
titlemedium

11/9/23

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyPICF-402

Status
colourYellow
titlemedium

11/13/23

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyPICF-416

Status
colourYellow
titlemedium

12/10/23

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyPICF-423

Status
colourYellow
titlemedium

1/11/24

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyPICF-408

Status
colourYellow
titlemedium

11/20/24

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyPICE-536

Status
colourYellow
titlemedium

2/27/24

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyPICE-537

Status
colourYellow
titlemedium

3/5/24

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyPICF-438

Status
colourYellow
titlemedium

3/12/24

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyPICF-439

Status
colourYellow
titlemedium

3/13/24

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyPICE-542

Status
colourRed
titlehigh

3/13/24

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyPICE-543

Status
colourRed
titlehigh

3/15/24

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyPICF-440

Status
colourYellow
titlemedium

3/24/24

Jira Legacy
System Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyPICE-451

Status
colourYellow
titlemedium

3/22/24

Q2 Sprint Priority Items

Legend

...

Jira, Description, and Status

Priority

Component

Date Started

Date Completed

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLC-129

Status
colourRed
titleHigh

idP/EPPN

4.27.23

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLQ-920

Status
colourRed
titleHighest

Financial Aid Integration

2.22.23

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLQ-952

Status
colourRed
titleHighest

Financial Aid Integration

3.28.23

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLQ-972

Status
colourRed
titleHigh

Financial Aid Integration

6.8.23

1.23.24

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLQ-855

Status
colourRed
titleHigh

Product Maintenance

1.18.23

1.18.24

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLQ-845

Status
colourYellow
titlemedium

System Enhancement

7.26.22

12/21/23

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLN-675

Status
colourYellow
titlemedium

Reverse Import

5.17.23

2.6.24

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLN-664

Status
colourYellow
titlemedium

eTranscripts

3.2.23

1.23.24

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLN-727

Status
colourYellow
titlemedium

Error Handling

7.5.23

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLQ-991

Status
colourRed
titlehigh

ASSIST File

7.24.23

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLN-280

Status
colourRed
titlehighest

Student Eligibility Checker

4.22.23

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLQ-673

Documentation

12.3.21

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLQ-977

Financial Aid Integration

6.12.23

3.14.24

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLQ-1010

Status
colourYellow
titlemedium

Financial Aid Integration

10/10/23

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLQ-713

Status
colourRed
titlehigh

Preferred Name

10/10/23

1.16.24

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLQ-988

Status
colourYellow
titlemedium

Admin Panel/Reporting

10/10/23

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLQ-286

Status
colourBlue
titlelowest

Accessibility

10/12/23

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLQ-724

Status
colourRed
titlehigh

Payment Processor

10/10/23

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLQ-1015

Status
colourYellow
titlemedium

Financial Aid Integration

10/16/23

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLN-683

Status
colourRed
titlehigh

Preferred Name

10/10/23

2/22/24

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLN-765

Status
colourRed
titlehigh

Census Date Issue

10/16/23

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLN-752

Status
colourRed
titlehigh

Waitlist

10/13/23

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLN-771

Status
colourRed
titlehigh

Seat Counts

10/16/23

2/23/24

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLN-784

Status
colourRed
titlehighest

Reverse Import

11/17/23

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLN-789

Status
colourRed
titlehighest

Script update LACCD

11/17/23

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLN-730

Status
colourRed
titlehigh

Program Code

7/6/23

2.6.24

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLQ-989

Status
colourYellow
titlemedium

Sync/Asynch

7.13.23

2.14.24

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLQ-1036

Status
colourYellow
titlemedium

UI Language update

11/21/23

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLQ-1037

Status
colourYellow
titlemedium

Admin Panel

11/28/23

1.4.24

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLQ-979

Status
colourRed
titlehighest

Search

06/12/23

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLQ-1022

Status
colourYellow
titlemedium

Preferred Name

10/24/23

1.10.24

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLN-803

Status
colourYellow
titlemedium

Sandbox

12/19/23

2/22/24

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLN-775

Status
colourYellow
titlemedium

UI Language update

11/8/23

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLN-686

Status
colourRed
titlehigh

Preferred Name

6.6.23

1.9.24

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLQ-976

Status
colourRed
titlehighest

Financial Aid

6.12.23

1.9.24

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLQ-1028

Status
colourRed
titlehigh

Financial Aid

11.2.23

2.13.24

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLQ-1017

Status
colourYellow
titlemedium

UI Language update

10/18/23

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLQ-1002

Status
colourRed
titlehigh

eTranscripts

9.12.23

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLQ-1061

Status
colourRed
titlehighest

eTranscripts

2.9.24

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLQ-1033

Status
colourYellow
titlemedium

Seat Filter

11.9.23

3.1.24

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLQ-1031

Status
colourYellow
titlemedium

Email Drop Notification

11.6.23

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLQ-1064

Status
colourRed
titlehighest

FA Integration

2.29.24

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLQ-1065

Status
colourRed
titlehighest

FA Integration

2.29.24

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLC-137

Status
colourRed
titlehigh

FA Integration

1.30.24

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLC-138

Status
colourYellow
titlemedium

eTranscripts SaaS

3.5.23

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLC-139

Status
colourRed
titlehighest

CCCTC Proxy Trap

2.27.24

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLN-841

Status
colourRed
titlehighest

API

3.11.24

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLN-846

Status
colourYellow
titlemedium

API

3.18.24

3.20.24

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLN-845

Status
colourRed
titlehigh

API

3.14.24

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLN-842

Status
colourYellow
titlemedium

Person Match

3.11.24

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLN-799

Status
colourRed
titlehigh

Search Match

3.14.24

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLN-739

Status
colourYellow
titlemedium

Documentation

3.13.24

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLQ-1071

Status
colourRed
titlehighest

Search

3.15.24

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLQ-1023

Status
colourRed
titlehigh

UI Updates

3.18.24

Jira Legacy
serverSystem Jira
serverId3bc2d1ff-b4f9-313a-8d84-ca6b48c5c997
keyBLC-140

Status
colourYellow
titlemedium

Student Eligibility Checker

3.11.24

...